Date: 07-10-2026.
Test location
Not available. D2 (GoHighLevel test location) is still open, and no GoHighLevel access was set up in this Claude Code session. Following the brief's fallback, this part delivers full specifications plus a local simulation (Local Workflow Evidence.md). No CRM, calendar, email or workflow was created or changed anywhere.
Results
| Check | Result |
|---|---|
Simulator tests (node --test in simulator/) |
9 / 9 passed |
| 7 test contacts: tier, stage, tags, emails match expected | 7 / 7 (Local Workflow Evidence.md) |
| Every submission gets E0 exactly once | Passed (incl. double submit) |
High-fit follow-up stops on call-booked |
Passed (TC1, TC6) |
| Unqualified: delivery plus three nurture emails | Passed (TC3, TC4, TC5) |
| Low: no booking CTA in nurture | Passed by copy and simulator scope (TC4) |
| Booking confirmation + reminder (24 h / 1 h) | Passed in simulation; scoped to the mock calendar |
| Cancellation path | Passed (TC7) |
| No send without consent | Passed |
| Routing order matches Parts 4–6 (same engine function) | Passed |
| Field keys match Part 6 field map | Checked by hand: all 5 questions, 4 app fields, 3 UTMs present in CRM map |
| Workflows OFF | Yes: nothing exists to turn on |
| Live emails sent | None |
What the simulation does not prove
- GoHighLevel's actual trigger, wait and goal behaviour (to be confirmed in the test location).
- Real email rendering, deliverability, merge fields and unsubscribe handling.
- PDF generation and the
plan_pdf_linkvalue. - Mini-app → GHL hidden-field hand-off in a real GHL form (D11/G3).
Gaps
| Gap | Dependency |
|---|---|
| GHL test location | D2 |
| Test sender, reply-to, team notification inbox | D5 |
plan_pdf_link: PDF generation and hosting |
New gap (G-PDF); needs host (D4) |
booking_link: mock calendar URL |
A12, D2 |
| Email footer business address | Nazim / Pareto |
| Proof in emails | D1 (none used) |
When the test location is confirmed (build checklist)
- Confirm the location name with Nazim on screen before any edit; record the name only, never keys.
- Create custom fields, tags and the pipeline exactly as in
CRM Field and Pipeline Map.md. - Build the form with hidden fields; test one fake submission for field capture.
- Build the mock calendar (30 min, mock availability).
- Build WF1–WF5 as drafts (OFF), re-entry off.
- Show Nazim the exact email copy, sender and test contacts; wait for approval.
- With approval, turn on for TC1–TC7 only, run, compare with
Local Workflow Evidence.md, then turn OFF.
Estimate
- GHL build and test run, once D2 and D5 are answered: about 2–3 hours.
- PDF generation and hosting for
plan_pdf_link: about 1–2 hours, after a host is chosen (D4).
